IMCA M166 PDF

Arataur As soon as the DPO entered the follow-sub mode, the centre of rotation jumped back to the centre of gravity, giving a 15 metre drive off. Again, event trees would require to be developed with extra cost. For example, a nuclear accident in the USA is believed to have been initiated by the simultaneous failure of two valves, due to them having both been wrongly maintained by the same team of fitters. Machinery space dampers or rig saver dampers failing to the shut position starving engines of combustion air.

Author:Maujinn Mazusida
Country:Nepal
Language:English (Spanish)
Genre:Marketing
Published (Last):21 May 2010
Pages:388
PDF File Size:1.38 Mb
ePub File Size:2.20 Mb
ISBN:901-2-92349-601-1
Downloads:93584
Price:Free* [*Free Regsitration Required]
Uploader:Mile



The DP system is to be arranged such that failure of any component or system necessary for the continuing correct functioning of the DP system, or the loss of any one compartment as a result of fire or flooding will not result in a loss of position.

The FMEA will use the results of the tests in the final analysis and usually include the test sheets in the report. What is to be worked on?

The four sections and appendices are designed to be read separately or as a single document. The specific techniques that are used and the level of detail with which they are applied are dependent on the scope of the study. A brief description of the parts of the system under study broken down into levels. Fault trees provide a convenient symbolic representation of the combination of events resulting in the occurrence of the top event.

The consequences of each assumed failure mode on item operation, function, or status will be identified, evaluated, and recorded. Note that for a Failure Modes and Criticality Analysis FMECAeach block can be assigned a failure rate figure from failure data and the overall system reliability calculated see Section 8.

Please refer to Chapter 3. Obviously, a single failure will mean loss of the system function, but the FMEA will be able to lmca point areas where inexpensive changes could be made that will increase the availability of the system, for example, adding duplicated power supplies. It is therefore important that the system alerts the operator to failures and means of failure detection, such as audible and visual warning devices, automatic sensing devices, sensing instrumentation and such like, should be identified.

It is believed that a narrative format could possibly leave parts of a system overlooked, unless the analyst carrying out the work is very thorough. Problems are not necessarily confined to vessels incorporating full redundancy. Case narrative A DP2 pipelay vessel was set up on imc DP engaged in pipelay operations, inside the m zone of a fixed platform. Loss of one supply if not alarmed is a hidden failure and will mean that a failure of the other supply will result in a total failure of the system being supplied.

An FMEA is a kmca tool that has been around for many years and is recognised as an essential function in design from concept through to the development of every conceivable type of equipment.

The performance level should include that for an intact system with no failures and also that for a system suffering a single failure usually the worst case failure scenario. The predictable failure modes for each systems level analysed will be identified. The consequences of each assumed failure affecting the next higher systems level will be described. Cabling to equipment that forms part of the designed redundancy requirement is to neither run along the same route, nor in the same compartment as the cabling for other parts of the designed redundancy.

Defining the boundaries of the system to be analysed? WHY Who wants one and why do they want one? Case study — Load sharing imbalance caused loss of position A considerable amount of attention appears to have been given to the design of electrical systems, as the trend of electrical incidents jmca to be downwards.

Sometimes, if the failure rates are not available, they are estimated, which will dilute the credibility of the final figure. For example, at subsystem level, it is generally acceptable to consider failure of equipment items and their functions, e. As all of the blocks are in series, if any one of the blocks fails completely then the system will fail as there are no redundant or parallel paths. Areas for Special Consideration: The arithmetic mean which is the sum of a number of mm divided by the number itself.

It is appreciated that under certain conditions more than one item will be undergoing planned maintenance, and unplanned maintenance on further equipment may be necessary. There are other standards, such as that included in the Japanese Industrial Standard, which use similar techniques but the ones above are sufficient for reference purposes. In the case of a two engineroom inca, half of the generating capacity umca be located in one engineroom and the other half in the other engineroom.

What would be the effect on the station keeping should all of this occur imc System effects ijca and define the total effect an assumed failure has on the operation, function, or status of the main system.

So what if it was feasible…. Where DP is concerned, major equipment grouping is usually organised as follows: Level A B C D E Probability 10 -1 Description Likely to occur frequently Probable — may occur several times in the life of an item Occasional — may occur sometime in the life of an item Remote — unlikely to occur but possible Improbable — unlikely to occur at all 10 10 -4 -5 These are entered into a table to form a risk assessment matrix: There is no set maximum and minimum content, but sufficient documentation must be included in the report to substantiate what has been done during the analysis and how the findings were achieved.

The engineer on watch noticed a developing load imbalance across the online engines. The FMEA must, therefore, be initiated at as early a stage in the design process as possible, and at a time when there is something to analyse. It is easiest to track all drawings received, reviewed and revised using a database. Sometimes certain elements or basic events may need to occur together in order for the top event to occur. See text 8 Failure Detection 9 Compensating Provisions: Two independent automatic control systems are to be provided and arranged such that no single fault will cause loss of both systems, a fault in one causing automatic bumpless transfer to the backup system.

Only m16 testing of the system, either during factory tests using the actual hardware, or during shipboard commissioning and sea trials, will reveal any problems with software bugs. Lack of redundancy in the forward cooling system to all thrusters forward gave the possibility that all thruster drives would shut down if mica pump kmca. MTTR — The statistical mean of the distribution of timesto-repair. Without an efficient interface, the FMEA will not have current design information and could develop without adequate input from imcx designers.

Any fuel problems such as a broken pipe, a valve malfunction, or water in the fuel could cause loss of all generating engines if redundancy is not built into the system. Related Articles.

LEARNING CHARISMA JOHN ANTONAKIS PDF

Guidance on failure modes and effects analysis (FMEA)

The DP system is to be arranged such that failure of any component or system necessary for the continuing correct functioning of the DP system, or the loss of any one compartment as a result of fire or flooding will not result in a loss of position. The FMEA will use the results of the tests in the final analysis and usually include the test sheets in the report. What is to be worked on? The four sections and appendices are designed to be read separately or as a single document. The specific techniques that are used and the level of detail with which they are applied are dependent on the scope of the study.

GAMSAT PRACTICE QUESTIONS PDF

IMCA M166 PDF

Again, if any one of the blocks fails completely then ikca system will fail as there are no redundant paths. Essential services for the generators such as fuel oil and cooling systems are to be arranged in a similar manner. Putting artificial limits on the depth of the analysis, either in the availability ikca detailed drawings or in preventing specific FMEA trials, say, will not meet the required objectives. In addition to the two mutually independent control systems, a back-up DP-control system is to be arranged in m emergency DP-control station, separated from the main centre by an A division. This generator took the entire load whilst the others shed load to maintain frequency.

Related Articles